The project was for a Distributed Redundant design to be completed in blocks of 5MW which was a deviation from the typical client design. APM also designed an indirect evaporative cooling system (another first) with heat recovery, water recovery and rainwater harvesting and treatment to reduce the impact of water consumption on the site.
The initial scope was design assistance to the wider team to support a planning application on two separate sites.
APM then completed RIBA stage 2 and stage 3 design for the project.
End Client:
Confidential
Project Value (€):
250M
APM Client:
Winthrop Technologies Ltd
M&E Contract Value (€):
180M
Project Type:
Design & Build
Duration:
60 Months
Location:
Holland