Food & Beverage

Newbridge, Co. Kildare

Ampromech were initially engaged by Gray Integrated Services to initially close out the M&E design for a 16.5m2 brownfield facility in Newbridge, Co. Kildare. An existing warehouse building was fully upgraded to F&B standards including process rooms, utility plant rooms and warehousing. The project involved design and installation of a highly automated soft drink concentrate facility.
Food & Beverage Front of Facility Image
Case studies

Project ABC:

The overall project involved the provision of the following:
Dry material handling
Bulk liquid unloading and storage
Liquid batching tanks,
Ingredient induction skids,
CIP centre and
Packaging
Food & Beverage Facility Image
Case studies

Project Specific Design Services:

As the project developed APM were engaged on site for 18 months to assist with design support from our engineering team as well as two of our team members based on site who were fully integrated into the overall Gray team and acted as key personnel in the process integration, commissioning and successful handover of the project.
The key aspects of the APM role on this project were as follows:
Electrical network design finalisation.

Instrumentation loop sheet generation for over 1,200 process instruments in 34 control panels.  

Site walk downs and commissioning support for 26 process and 19 utility systems including over 12 kms of pipework, over 1700 valves and 202 major equipment items.
Food & Beverage Facility Image
Food & Beverage Image
Integrated design of multiple different vendor supplied P&IDs and systems, and hand-in-hand coordination with other disciplines.
Process vendor coordination for 10+ different vendors including different jurisdictions (US, Canada, France, etc.) 
HAZOP facilitation and close out, ATEX integration support and CE certification assistance.  
Case studies

Project ABC:

End Client:

Keurig Dr.Pepper

Project Value (€):

170M

APM Client:

Gray Integrated Service

M&E Contract Value (€):

60M

Project Type:

EPCM Contract

Duration:

24 Months

Location:

Newbridge, Co. Kildare

Who we work with

Trusted By Leading Companies

Kirby Engineering & Construction Logo
LeoLynch Logo
John Paul Construction Logo
STS Logo
Gray Logo
Keurig Dr Pepper Logo
Tamaki Control Logo
TOT Architects Logo
What we’ve done

See More Case Studies

PHARMA

Pharma Projects

Various Locations
POWER GENERATION

Grange Castle Power Plant

Grange Castle, Co. Dublin
Data Centre

Project Iris

Holland

Embark on a journey towards innovation!

Connect with our expert team today. We’re here to answer your questions and guide you through the engineering solutions you need.